The software is ready on day one. We help with the floor.
Tagging the existing asset base and placing readers is where a rollout takes time. We run that part with you, branch by branch.
Request a DemoHow a branch goes live
Run with an implementation lead, not handed over as a manual.
Scope the site
Walk the branch, decide RFID vs barcode by zone, and plan reader placement.
Tag the asset base
Tag existing assets and load them into the register, done properly once.
Commission readers
Install fixed readers, configure handhelds, verify every read.
First reconciliation
Run the first full count with an implementation lead present.
Train the team
Walk staff through the handheld and console on their real assets.
When rollout is treated as a software install
A login and a quick-start guide is not how a physical rollout succeeds.
Tagging stalls
Without someone driving it, tagging never finishes and the register never catches up.
Readers in the wrong place
A reader placed without planning misses the reads it was installed for.
A confusing first count
Without experience present, the first reconciliation becomes noise, not a baseline.
Staff revert to spreadsheets
A team handed an app with no walkthrough goes back to what it knows.
What's included
- Site walk & reader plan
- Placement and technology choices before anything is ordered.
- Hands-on tagging
- An implementation lead on site for the tagging pass.
- Reader commissioning
- Every reader verified against the register before go-live.
- Team training
- Walkthroughs with the staff who will run the next count.
Why it's run as a service
A clean baseline
The first reconciliation becomes a baseline everyone trusts.
Right placement first time
No re-running cable or re-mounting hardware.
Real adoption
Staff trained on their own asset base keep using the system.
Tell us about your first branch
Site count, rough asset count, and what tracks them today.
Questions
Do you tag every asset, or do we?
Both, in practice. Our lead runs the tagging pass on site with your team.
How long does one branch take?
It depends on asset count and layout. Usually days once a reader plan is in place.
Is this priced separately from the platform?
Yes, it is scoped separately. Send your site details and we will give a straight answer.