ASSET TraV

Depreciation that runs off a register you can trust

Straight line, reducing balance or units of production. Preview the full schedule before anything posts, then send it to the journal in one step.

Request a Demo

From capitalisation to a posted journal

Depreciation reads the same asset record the register and the audit both write to.

  1. Set the method

    Straight line, reducing balance or units of production, per category or overridden per asset.

  2. Preview the batch

    Run a batch for the period and review every line before anything writes to the ledger.

  3. Post to the journal

    Approve the preview and post a journal entry generated directly from the batch.

  4. Track the ledger

    Every asset's book value and accumulated depreciation is queryable on its own ledger.

What breaks on a register nobody corrected

The schedule is only as honest as the asset base it runs against.

Disposed assets keep depreciating

A write-off that never reached the books keeps running a charge through the P&L.

Manual recalculation errors

One spreadsheet formula copied down wrong, and nobody notices until the auditor does.

No preview before it is final

A run that posts straight to the ledger turns every mistake into a correcting entry.

Planning on stale numbers

Budgeting off a book value that ignores real disposals means the plan is wrong before it starts.

Everything you need to close on time

Batch run with preview
Run a full period, review every line, then commit it to the journal.
Methods per category
Different categories run different methods without separate spreadsheets.
Depreciation reports
Reporting built for the methods you actually use.
Per-asset ledger
Book value, accumulated depreciation and schedule history on each asset.

Why it delivers cleaner books

Reads the corrected register

A disposal reconciled last week is already reflected in this period's run.

Preview before posting, always

A batch run is a draft until someone approves it.

Built for close

The posting flow is designed around closing books on time, not just producing a number.

Run a batch against your own assets

Bring your current methods and a sample category to the demo.

Request a Demo →

Questions

Can categories use different methods?

Yes, the method is configurable per category and can be overridden per asset.

What if a batch run has an error?

Nothing posts until you approve the preview. Fix the asset record and re-run.

Does this replace our ERP's general ledger?

No. It generates the journal entry. Your ERP stays the ledger of record.